Skip to content

Gubra Green

Spectra:
Solar & battery park

Spectra

2MW solar & battery park

Able to generate twice over the electricity required to power Gubra labs and operations today

Gubra Green’s solar and battery park in Denmark, established in 2025, combines renewable power generation with energy storage in one integrated solution. By linking solar capacity with batteries, the park supplies clean energy and provides balancing services to the Danish national grid, thereby supporting a resilient and flexible energy system.,

With 2 MW of solar capacity and 2 MWh of battery storage, the park generates enough electricity to power 400–500 Danish households annually, or nearly twice Gubra’s own annual operational consumption. At the same time, it supports biodiversity through habitat creation and protection initiatives.

2 MW
solar capacity


8 MWh
battery storage


Power for 400-500 households
or

Twice the electricity needed to power Gubra’s annual operations (2025 consumption)

Gubra Green

Contact us

Consult with Virginia Dundas
Head of ESG, Gubra Green

Gubra
Hørsholm Kongevej 11B
2970 Hørsholm
Denmark

Back To Top